- Designed for HS-20 Loading (Other Loading Available: Port, Aircraft, etc.)
- Concrete Compressive Strength of 5,500 PSI at 28 Days
- Steel Reinforced Precast Concrete ( Other Reinforcement Options Available)
- Manway Access Opening (shown)
- Thin Wall Knockouts for Easy Installation (shown)
- Terminators as Needed
- Pull Irons Cast In Floor (shown)
- 6″ Ø Recessed Sump in Floor (shown)
- 2″ Ø Ground Hole in Floor (shown)
- Concrete Slab Top with Cast Iron Ring & Cover (shown)
- No Special Lifting Attachments Required- Standard Hooks Only
- Smooth Corners for Safe Installation & Quality &…It Just Looks Better!
- Unistrut Cast into Wall for Racking In lieu of Bolt Inserts
- Terminators Cast into Wall in lieu of Thin Wall Recess
- Non-Metallic Racking
- Plastic Coated Racking
- HDG Racking
- Cast In Grounding Lug
- Pull Irons – Add or Change Locations
- Divider Plate for Multi-Purpose Boxes
- 12″ Dia. Plastic Sump Pan In lieu of Sump Recess
- 18″ x 18″ Below Floor Sump In lieu of Sump Recess
- 24″ x 24″ Below Floor Sump In lieu of Sump Recess
- Open Bottom
- Custom Sizes Upon Request